Text
Model Eoq Untuk Barang Yang Mengalami Penurunan Mutu Dengan Tingkat Produksi Terbatas Dengan Shortage Dan Complete Backlogging
ABSTRAK
MODEL EOQ UNTUK BARANG YANG MENGALAMI PENURUNAN
MUTU DENGAN TINGKAT PRODUKSI TERBATAS DENGAN SHORTAGE
DAN COMPLETE BACKLOGGING
Oleh
Diyo Raihan Putra Ramadhan
24010116130041
Dalam skripsi ini akan dibahas tentang model EOQ untuk barang yang mengalami
penurunan mutu dengan tingkat produksi terbatas dengan shortage dan complete
backlogging. Hal ini dikarenakan banyak perusahaan yang menyimpan persediaan di
gudang dan mengalami kerugian karena selama masa penyimpanannya, barang-barang
tersebut mengalami penurunan mutu atau kerusakan saat masa pakainya sudah habis.
Tentunya ini merupakan kerugian untuk perusahaan karena harus membayar biaya
penalti berupa penalti linear dan penalti eksponensial kepada konsumen berdasarkan
Distribusi Weibull. Terdapat juga kasus shortage yang terjadi di perusahaan karena
jumlah permintaan lebih besar dibanding jumlah persediaan serta terjadinya kasus
complete backlogging karena barang yang diminta tidak langsung dikirim, melainkan
ditumpuk terlebih dahulu di gudang sampai waktu yang ditentukan oleh konsumen.
Studi kasus dilakukan di PT. Nippon Shokubai Indonesia berupa pemesanan bahan
baku CAA (Acrylic Acid) yaitu C3 (Propylene). Dari data yang diperoleh didapatkan
hasil yaitu dengan menerapkan metode EOQ untuk barang yang mengalami penurunan
mutu dengan tingkat produksi terbatas dengan shortage dan complete backlogging,
perusahaan dapat menghemat biaya yang dikeluarkan sebesar US$ 0,0104 untuk kasus
biaya penalti linear dan sebesar US$ 1,9726 untuk kasus biaya penalti eksponensial.
Kata Kunci : Model EOQ untuk barang yang mengalami penurunan mutu, Shortage,
Complete Backlogging
ABSTRACT
AN EOQ MODEL FOR TIME DETERIORATING ITEM WITH FINITE
PRODUCTION RATE WITH SHORTAGE AND COMPLETE BACKLOGGING
By
Diyo Raihan Putra Ramadhan
24010116130041
In this research will be discussed about the EOQ model for time deteriorating item with
finite production rate with shortage and complete backlogging. This is because many
companies store inventory in warehouses and suffer losses because during their storage
period, these items suffer from a deterioration in quality or damage when their useful
life is over. Surely this is a loss for companies because they have to pay penalty fees in
the form of linear penalties and exponential penalties to consumers based on Weibull
Distribution. There are also cases of shortage that occur in companies because the
amount of demand is greater than the amount of inventory as well as the case of
complete backlogging because the requested goods are not immediately sent, but are
piled up in the warehouse until the time specified by the consumer. Case studies
conducted at PT. Nippon Shokubai Indonesia is in the form of ordering CAA (Acrylic
Acid) raw material, named C3 (Propylene). From the data obtained, the results obtained
by applying the EOQ method for time deteriorating item with finite production rate
with shortage and complete backlogging, the company can save costs incurred in the
amount of US $ 0.0104 for the case of linear penalty costs and for US $ 1, 9726 for the
case of an exponential penalty fee.
Keywords : EOQ model for time deteriorating item, shortage, complete backlogging
2296A20IV | 2296 A 20-iv | Perpustakaan FSM Undip (Referensi) | Tersedia |
Tidak tersedia versi lain